
 Likes: 
 1
	
 
	
	
 Dislikes: 
 0
	
 
 
	
		
		
	
	
	
	
		
	
	
		
			
- 
	
	
		
			
			
				Moderator
			
			
			
			
				
					
						
					
				
			
			
			
				
			
			 
			
				
				
				
				
				
					    
				
			
		 
		
			
				
				
						
						
				
					
						
							I fixed it this morning and I THINK it's right. I did the math in EXCEL and it showed 151 (and some hours and minutes) when I was messing with it in there and that is what showed up when I did the fix. It shows 150 days now. But let me know if I did the math wrong. It's been a long week and I was doing this at 5AM (and I'm not a morning person - not even close). 
After 06/30 I won't have one of those pesky jobs any more so I will be quicker to respond. At least until I figure out how to remedy that situation. 
						
					 
					
				 
			 
			
			
		 
	 
		
	
 
		
		
		
	
 
	
	
	
	
	
	
	
	
	
	
	
	
		
		
			
				
				Posting Permissions
			
			
				
	
		- You may not post new threads
 
		- You may not post replies
 
		- You may not post attachments
 
		- You may not edit your posts
 
		-  
 
	
	
	Forum Rules